Some of our Past Experience in the Power Sector are as follows:
| 2007 - ... |
Project Name: |
Due Dilligence of Renewable and Coal Fired Power Plants in Turkiye |
| Client: |
EnBW, Germany and Turkiye Office |
| Work Description: |
Performing the due dilligence services for selected hydro, wind, geothermal and coal fired green field power projects.
|
| Duration of Contract: |
Still continuing |
| 2007 - 2008 |
Project Name: |
Energy Market Study and Privatization of the
Disco and Generation in Turkiye
|
| Client: |
Hydrocontracting Group, Austria/PELKA, Ankara
|
| Work Description: |
Studying the current energy market structure
and projections
Tariff system analysis for generation and
demand side.
Permitting procedures for coal fired power
plants.
|
| Duration of Contract: |
2 Months |
| 2006 – 2007 |
Project Name: |
Financing of 47 MWe capacity GURMAT Geothermal Energy Generation Inc., in Turkiye |
| Client: |
West LB, London |
| Work Description: |
Studying the current energy market structure and projections
Tariff system analysis for generation and demand side.
|
| Duration of Contract: |
3 Months |
| 2006 – 2007 |
Project Name: |
Electricity Generation Price Forecast of Turkiye
|
| Client: |
AES, USA / ICTAS Enerji AS
|
| Work Description: |
Energy Market Structure Overview.
Existing Electricity Tariff structure for Renewables
and other new entrants.
Market Share and Tariff differences between the
generators.
Generation and Tariff projections in mid and long
term based on different type of generators.
|
| Duration of Contract: |
2 Months |
| 2005 – 2006 |
Project Name: |
Antalya Cogeneration Power Project |
| Client: |
BIS ENERJI A.Ş.
|
| Work Description: |
Preparing the feasibility study for 100 MWe
capacity gas fired power plant for supplying electricity to Antalya
region.
|
| Duration of Contract: |
8 Months |
| 2005 – 2006 |
Project Name: |
KUMKOY Hydroelectric Power Plant (15 MWe) |
| Client: |
BIS ENERJI A.Ş.
|
| Work Description: |
Due diligence of the KUMKOY Power Plant which
is under construction stage of DSI project before
privatization.
Preparing the bid price and revising the existing
feasibility study.
|
| Duration of Contract: |
6 Months |
| 2004 |
Project Name: |
Energy Market Study and Projections of Turkiye |
| Client: |
BIS ENERJI A.Ş.
|
| Work Description: |
Energy Market Study based on the new
Legislations and projections
BISENERJI AS status change report (from the
authoproducer to IPP)
|
| Duration of Contract: |
4 Months |
| 2003– 2005 |
Project Name: |
CINKUR Gas Engine Power Plant |
| Client: |
Iktisat Leasing Inc.
|
| Work Description: |
Due diligience of 46 MWe capacity fuel oil fired
power plant for moving the plant to another
location and preparing the feasibility study for
the new location.
|
| Duration of Contract: |
16 Months |
| 2001 – 2003 |
Project Name: |
Cogeneration Power Plant (50 MWe) |
| Client: |
Konya Organized Zone Directorate
|
| Work Description: |
Feasibility Study for a gas fired cogen. power
plant (50MWe Capacity) and energy sales
contract negotiations. |
| Duration of Contract: |
26 Months |
| 2000 – 2001 |
Project Name: |
Renewable Energy Market Study for Turkiye |
| Client: |
World Bank
|
| Work Description: |
Reviewing existing Government Energy Policy,
Laws and Regulation on Energy Sector.
Policy measures for Renewable Energy
Program and Incentives.
Potential Resources for Renewable Energy.
Demand Patterns in the regions.
Potential for authoproducers sales contracts in
the Grid.
|
| Duration of Contract: |
10 Months |
| 1999 – 2000 |
Project Name: |
Aslantas Dam and HPP project evaluation
(138 MWe) |
| Client: |
World Bank Large Dams Commission
|
| Work Description: |
Preparing a case study for ASLANTAS
multipurpose hydro dam and power plant.
Evaluation of energy benefit of the power plant
since the installation date 1982.
|
| Duration of Contract: |
10 Months |
| 1999 – 2000 |
Project Name: |
AKEN Wind Power Plant (30 MWe) |
| Client: |
SEA WEST Wind Power Inc.,USA,
|
| Work Description: |
Rendering consultancy services to Cinergy
Global Inc. USA and MARUBENI Europower
Ltd. consortium for developing wind power
project in Turkiye.
Services had covered to energy market study
and supporting in preparing the feasibility study
based on BOT rules and Regulations.
|
| Duration of Contract: |
18 Months |
| 1998 - 2003 |
Project Name: |
Konya-Ilgin Thermal Power Plant (500
MWe) |
| Client: |
PSEG Global, NJ, USA
|
| Work Description: |
Consultant to the client for site evaluation,
contract negotiation with EUAS, MENR, TKI
and other state utilities based on BOT
Legislations
|
| Duration of Contract: |
68 Months |
| 1997 - 2001 |
Project Name: |
BOYABAT Hydro Power Plant (513 MWe) |
| Client: |
Houston Industry Energy, Tx, USA /
DOGUS
|
| Work Description: |
Duediligence of the existing power systems
and assisting HIE in development of the
possible power projects including thermal and
hydroelectric power plants and regional
distribution systems in Turkiye. The task had
covered also the developing 513 Mwe capacity
BOYABAT Hydroelectric power plant under
BOT scheme.
|
| Duration of Contract: |
48 Months |
| 1998 – 2000 |
Project Name: |
DINAR Hydro Power Plant (2x1.7 MWe) |
| Client: |
METAK Power Generation Inc.
|
| Work Description: |
Tender document preparation, proposal
evaluation and permitting
|
| Duration of Contract: |
18 Months |
| 1996 - 1998 |
Project Name: |
ENTEK Cogeneration Power Plant (90 MWe) |
| Client: |
ENTEK Independent Power Producer Inc.
|
| Work Description: |
154 kV Transmission connection study.
Contract document preparation and
negotiation with TEDAS for energy
distribution to the clients.
|
| Duration of Contract: |
2 Years |
| 1995 - 1998 |
Project Name: |
CANKIRI – Orta Coal Fired Power Plant
(250 MWe) |
| Client: |
ALSTHOM Pyropower, San Diego, USA
|
| Work Description: |
Supporting the feasibility study preparation.
Contract negotiation with the Ministry of
Energy based on BOT scheme.
Permitting and fuel contract document
preparation
|
| Duration of Contract: |
42 Months |
| 1995 - … |
Project Name: |
BISENERJI Cogen Plant (370 MWe) |
| Client: |
BISENERJI Power Producer Inc.
|
| Work Description: |
Market Analysis, investment planning and
Permitting
|
| Duration of Contract: |
Still continuing |
| 1995 |
Project Name: |
TORTUM II HPP (2x5.5 MWe) |
| Client: |
NURTEK Power Plants and Operation Inc.
|
| Work Description: |
Preparing Feasibility Study
|
| Duration of Contract: |
6 Months |
|
|
|