Some of our Past Experience in the Power Sector are as follows:





2007 - ... Project Name: Due Dilligence of Renewable and Coal Fired Power Plants in Turkiye
Client: EnBW, Germany and Turkiye Office
Work Description: Performing the due dilligence services for selected hydro, wind, geothermal and coal fired green field power projects.


Duration of Contract: Still continuing




2007 - 2008 Project Name: Energy Market Study and Privatization of the Disco and Generation in Turkiye
Client: Hydrocontracting Group, Austria/PELKA, Ankara

Work Description: Studying the current energy market structure and projections

Tariff system analysis for generation and demand side.

Permitting procedures for coal fired power plants.


Duration of Contract: 2 Months




2006 – 2007 Project Name: Financing of 47 MWe capacity GURMAT Geothermal Energy Generation Inc., in Turkiye
Client: West LB, London
Work Description: Studying the current energy market structure and projections

Tariff system analysis for generation and demand side.


Duration of Contract: 3 Months




2006 – 2007 Project Name: Electricity Generation Price Forecast of Turkiye
Client: AES, USA / ICTAS Enerji AS

Work Description: Energy Market Structure Overview.

Existing Electricity Tariff structure for Renewables and other new entrants.

Market Share and Tariff differences between the generators.

Generation and Tariff projections in mid and long term based on different type of generators.


Duration of Contract: 2 Months




2005 – 2006 Project Name: Antalya Cogeneration Power Project
Client: BIS ENERJI A.Ş.

Work Description: Preparing the feasibility study for 100 MWe capacity gas fired power plant for supplying electricity to Antalya region.


Duration of Contract: 8 Months




2005 – 2006 Project Name: KUMKOY Hydroelectric Power Plant (15 MWe)
Client: BIS ENERJI A.Ş.

Work Description: Due diligence of the KUMKOY Power Plant which is under construction stage of DSI project before privatization.

Preparing the bid price and revising the existing feasibility study.


Duration of Contract: 6 Months




2004 Project Name: Energy Market Study and Projections of Turkiye
Client: BIS ENERJI A.Ş.

Work Description: Energy Market Study based on the new Legislations and projections
BISENERJI AS status change report (from the authoproducer to IPP)


Duration of Contract: 4 Months




2003– 2005 Project Name: CINKUR Gas Engine Power Plant
Client: Iktisat Leasing Inc.

Work Description: Due diligience of 46 MWe capacity fuel oil fired power plant for moving the plant to another location and preparing the feasibility study for the new location.


Duration of Contract: 16 Months




2001 – 2003 Project Name: Cogeneration Power Plant (50 MWe)
Client: Konya Organized Zone Directorate

Work Description: Feasibility Study for a gas fired cogen. power plant (50MWe Capacity) and energy sales contract negotiations.
Duration of Contract: 26 Months




2000 – 2001 Project Name: Renewable Energy Market Study for Turkiye
Client: World Bank

Work Description: Reviewing existing Government Energy Policy, Laws and Regulation on Energy Sector.

Policy measures for Renewable Energy Program and Incentives.

Potential Resources for Renewable Energy.

Demand Patterns in the regions.

Potential for authoproducers sales contracts in the Grid.


Duration of Contract: 10 Months




1999 – 2000 Project Name: Aslantas Dam and HPP project evaluation (138 MWe)
Client: World Bank Large Dams Commission

Work Description: Preparing a case study for ASLANTAS multipurpose hydro dam and power plant.

Evaluation of energy benefit of the power plant since the installation date 1982.


Duration of Contract: 10 Months




1999 – 2000 Project Name: AKEN Wind Power Plant (30 MWe)
Client: SEA WEST Wind Power Inc.,USA,

Work Description: Rendering consultancy services to Cinergy Global Inc. USA and MARUBENI Europower Ltd. consortium for developing wind power project in Turkiye.

Services had covered to energy market study and supporting in preparing the feasibility study based on BOT rules and Regulations.


Duration of Contract: 18 Months




1998 - 2003 Project Name: Konya-Ilgin Thermal Power Plant (500 MWe)
Client: PSEG Global, NJ, USA

Work Description: Consultant to the client for site evaluation, contract negotiation with EUAS, MENR, TKI and other state utilities based on BOT Legislations


Duration of Contract: 68 Months




1997 - 2001 Project Name: BOYABAT Hydro Power Plant (513 MWe)
Client: Houston Industry Energy, Tx, USA / DOGUS

Work Description: Duediligence of the existing power systems and assisting HIE in development of the possible power projects including thermal and hydroelectric power plants and regional distribution systems in Turkiye. The task had
covered also the developing 513 Mwe capacity BOYABAT Hydroelectric power plant under BOT scheme.


Duration of Contract: 48 Months




1998 – 2000 Project Name: DINAR Hydro Power Plant (2x1.7 MWe)
Client: METAK Power Generation Inc.

Work Description: Tender document preparation, proposal evaluation and permitting


Duration of Contract: 18 Months




1996 - 1998 Project Name: ENTEK Cogeneration Power Plant (90 MWe)
Client: ENTEK Independent Power Producer Inc.

Work Description: 154 kV Transmission connection study.

Contract document preparation and negotiation with TEDAS for energy
distribution to the clients.


Duration of Contract: 2 Years




1995 - 1998 Project Name: CANKIRI – Orta Coal Fired Power Plant (250 MWe)
Client: ALSTHOM Pyropower, San Diego, USA

Work Description: Supporting the feasibility study preparation.

Contract negotiation with the Ministry of Energy based on BOT scheme.

Permitting and fuel contract document preparation


Duration of Contract: 42 Months




1995 - … Project Name: BISENERJI Cogen Plant (370 MWe)
Client: BISENERJI Power Producer Inc.

Work Description: Market Analysis, investment planning and Permitting


Duration of Contract: Still continuing




1995 Project Name: TORTUM II HPP (2x5.5 MWe)
Client: NURTEK Power Plants and Operation Inc.

Work Description: Preparing Feasibility Study


Duration of Contract: 6 Months